Import reference
What each importer brings across, what it does not, its limits, and how people are
matched. For the walk-through, see the
migration guide.
Before you import
| Plan |
Every plan includes importing, Free too: connecting a tracker, previewing it and running
the import. |
| Role |
Settings → Import is shown to Admin and Owner. |
| Token |
Read access to the source is enough. The token is used for the run and is not saved on the import job. |
| Target |
An xpntl project you choose. ClickUp creates the project from the Space instead, and Linear makes one for the team unless you choose one. |
How an import runs
- Connect. Pick the source and supply its token. xpntl reads the source. It never edits or deletes anything there.
- Preview. xpntl lists what it found under Choose issues to import, with every row selected. Filter by title, deselect rows, or deselect a whole status. Nothing is written at this step.
- Map assignees. See Matching people.
- Import. The run is a background job. The screen shows the total, how many were imported and how many failed, with a reason for each failed row.
What every import does
| Keys |
Each issue gets a new key in the target project. The key or number it had in the source is not kept. Linear is the exception: in a project with the team's key, which is the default, an issue keeps its number. See Linear. |
| Creator |
The person who ran the import is recorded as the creator of each issue. Linear is the exception: an issue keeps its creator when the creator matches a teammate. |
| Completion date |
An issue that arrives finished keeps the date it was finished in the source, so Insights counts imported work in the week it was done, not the week it was imported. Each source's date is in its section below. A parent that arrives finished because all of its sub-issues are is dated by its last sub-issue. Trello keeps no completion date, so a finished card is dated by its last activity. A finished CSV row with no completion date is dated to the import, and the result says how many were. |
| Labels |
A label that already exists by name is reused. New ones are created gray. ClickUp tags and Linear labels keep their color. |
| States |
A source status maps to your first workflow state of the matching type: Todo, In Progress, Done and so on. ClickUp, Linear and CSV look for a state with the same name first. |
Running an import twice
Run an import again whenever you like. It only brings what is new. Every importer except CSV
records each item it brings over by the item's own id in the source, so a later run skips
anything already there and the result says how many it skipped. A trial run and then a
cutover run is a normal way to migrate.
A skipped item is left as it is in xpntl. If it changed in the source after the first run,
the change does not come across.
A run reads the source the same way each time, so it stays inside the importer's limits
below. GitHub, Asana and Trello read the first 1,000 items and ClickUp the first 2,000, so in
a source bigger than that a second run does not reach the rest. Azure DevOps carries on past
what it already imported, 5,000 work items a run. Linear has no cap: a run reads the whole team.
A CSV file has no id that xpntl matches on, so a CSV import keeps no record: run the same file
again and every row is created again. To add rows later, import a file of only the new rows,
or deselect in the preview the ones you already imported.
Matching people
Jira, GitHub, Asana, Trello, Azure DevOps, Linear and CSV show a Map assignees panel
above the preview. It lists each distinct assignee found. A value that equals a teammate's
email, the part of it before the @, or their display name is matched for you. Choose a
teammate for any other value, or leave it at Unassigned.
- An assignee left unmapped imports as unassigned. It does not block the import.
- Jira, Azure DevOps, Linear and CSV also match on email when no mapping is given.
- Linear matches creators and comment authors the same way as assignees.
- GitHub provides logins and no emails, so GitHub assignees come only from the mapping.
- ClickUp has no mapping panel. It matches assignees by email, and an assignee with no matching email is not assigned.
By source
Jira Cloud
| Needs | Site URL, account email and an API token |
| Maps | One Jira project into an xpntl project you choose |
| Comes across | Summary. Description, converted from Jira's rich text. Status by category: To Do, In Progress and Done map to your Todo, In Progress and Done states. Priority: Highest becomes Urgent, High stays High, Medium stays Medium, Low and Lowest become Low. Labels. Assignee. Comments with their dates. Created and updated dates. For a finished issue, the date it was resolved, or the date it moved into Done when no resolution was set. |
| Does not come across | Attachments: a line naming each one stays in the text. Sub-task and epic hierarchy. Sprints, components, issue links, custom fields, due dates and issue type. |
| People | Mapping by display name, then a matching email. A comment keeps its author when the author's email matches a teammate. Otherwise it is posted by the person who ran the import. |
| Limits | The preview lists the first 2,000 issues. With every listed issue selected, the whole project is imported. |
Linear
| Needs | A personal API key, created in your Linear account's security settings |
| Maps | One team into a project with the team's key, made for it if there is none, or into an xpntl project you choose. Linear projects become lists, and their milestones become milestones named Project: Milestone. |
| Comes across | Title. Description, which Linear already keeps as Markdown, with a footer that links back to the Linear issue. Issue numbers: in a project with the team's key, ENG-123 stays ENG-123. In any other project the issue gets a new key, and its Linear identifier, and any it had before it moved teams, still open it where no other issue has that key. State by type, to your first state of that type: a started state goes to Review when its name includes "review" and to In Progress otherwise, and a canceled or duplicate state goes to Canceled. A state of yours with the same name wins when it is the same kind: open, completed or canceled. Priority, on the same scale. Labels, with their colors. A label in a group keeps its own name, or becomes Group/Label when two labels would share a name. Assignee. Creator. Comments with their dates. Sub-issues, under their parents. Relations: blocks, duplicate and related. Cycles, with their dates. Links attached to an issue, as lines at the end of its description. Due, created and updated dates, and the completed date of a completed issue. Archived issues, which arrive archived, unless you untick Include issues Linear has archived. |
| Does not come across | Files uploaded to Linear: the links stay in the text and open only for someone signed in to Linear. Issues in Linear's trash. Linear's similar-issue suggestions. Estimates as a field: xpntl has none, so each one is kept as a line in the description. |
| People | Mapping first, then a matching email, for assignees, creators and comment authors. A creator with no match is named in the description. A comment by someone with no match is posted by the person who ran the import and opens with the author's name. |
| Limits | The preview lists the first 2,000 issues. With every listed issue selected, the whole team is imported. A description or comment longer than 50,000 characters is cut short. A run waits out Linear's rate limits; if one lasts too long the run stops, and running it again carries on, skipping what it already brought. |
| Also | A sub-issue or relation whose other end is in another team is linked once both teams are imported, in either order. The result lists what the run made, what it skipped and what it left out. |
GitHub Issues
| Needs | The repository as owner/repo and a token with read access to it |
| Maps | One repository's issues into an xpntl project you choose |
| Comes across | Title. Body. Open issues land in Todo and closed issues in Done. Labels. The first assignee, when its login is mapped. Created and updated dates, and the closed date of a closed issue. |
| Does not come across | Comments. Milestones. Assignees after the first. Pull requests, which are skipped. Priority is left unset. |
| People | Mapping by login. There is no email match. |
| Limits | The first 1,000 issues, oldest first |
ClickUp
| Needs | A personal API token (pk_...) |
| Maps | One Space becomes an xpntl project of the same name, or fills an existing project with that name. Lists become lists. A list inside a folder is named Folder / List. |
| Comes across | Name. Description. Custom fields, as a list at the end of the description. Status, by state name and then by type. Priority. Tags, with their colors. Every assignee whose email matches a teammate. Sub-tasks, as sub-issues. Comments with their dates. Attachments. Start and due dates. Created and updated dates. For a finished task, the date it was done, or closed. |
| Does not come across | Archived lists and tasks. Custom fields as fields. Dependencies, checklists and time tracking. |
| People | Email match only. There is no mapping panel. |
| Limits | 2,000 tasks a run. 25 MB an attachment. |
| Also | An agent can run this import over MCP with xpntl_clickup_browse, xpntl_clickup_import and xpntl_import_status. |
Azure DevOps
| Needs | The organization name or its dev.azure.com URL, and a personal access token with Work Items (Read) scope |
| Maps | One project's work items into an xpntl project you choose |
| Comes across | Title. Description as Markdown, with repro steps for a bug and acceptance criteria under its own heading. Work item type: Epic, Feature, Story, Task and Bug. Any other type becomes Issue. State by category: New to Backlog, Active to In Progress, Resolved to Review, Closed to Done, Removed to Canceled. Priority: 1 becomes High, 2 becomes Medium, 3 and 4 become Low. Tags. Assignee. Parent links. Comments with their dates. Created and changed dates, and the closed date of a closed work item. |
| Does not come across | Attachments. Iterations and area paths. Links other than parent. Custom fields. Test plans, test suites and test cases, which are skipped. |
| People | Mapping by display name, then a matching email. A comment keeps its author when the author's email matches a teammate. Otherwise it is posted by the person who ran the import and opens with the author's name. |
| Limits | The preview lists the first 2,000 work items. 5,000 work items a run, and 200 comments a work item. Run it again for the rest. Azure DevOps Services only. |
Asana
| Needs | The project id or URL, and a personal access token |
| Maps | One project's tasks into an xpntl project you choose |
| Comes across | Name. Notes. Completed tasks land in Done and the rest in Todo. Tags, as labels. Assignee, when mapped. Created and modified dates, and the completed date of a completed task. |
| Does not come across | Comments. Subtasks. Sections: the preview shows them, the import does not keep them. Due dates, custom fields and attachments. Priority is left unset. |
| People | Mapping by name, or by email where Asana gives no name |
| Limits | The first 1,000 tasks |
Trello
| Needs | The board id or URL, an API key and a token |
| Maps | One board's cards into an xpntl project you choose |
| Comes across | Name. Description. State from the list: archived cards, and cards on a list whose name includes Done, Complete, Closed, Shipped, Resolved or Archive, land in Done. The rest land in Todo. Labels, by name, or by color where a label has no name. The first member, as assignee, when mapped. The date the card was created, read from its id. A finished card is dated by its last activity, since Trello records no completion date. |
| Does not come across | Comments. Checklists. Attachments. Due dates. Members after the first. |
| People | Mapping by member name |
| Limits | 1,000 cards |
CSV file
| Needs | A CSV file with a header row |
| Maps | One file into an xpntl project you choose. You map columns to fields. Title is required. |
| Comes across | Title. Description. Priority, as a number from 0 to 4. State, when the cell equals the name of one of your states. Assignee. Created date. Completed date, for a row whose state is a completed one. A date reads in a form like 2024-03-02; a slashed date reads month first, and a date in the future is ignored. |
| Does not come across | Labels, comments and hierarchy. A finished row with no Completed column is dated to the import. |
| People | Mapping first, then a cell that equals a teammate's email |
| Limits | 1,000 rows an import. 5 MB a file. |
| Run twice | Every row is created again. See Running an import twice. |